Industries & Contractor Specialties
Find guidance for your trade, with operations, hazards and submission details that matter to your insurance review.

General Contractors Insurance
Subcontracted work, project oversight and completed operations create different responsibilities at every stage of a build.

Concrete Contractors Insurance
Flatwork, structural concrete and foundations carry different loss potential—and should be described separately.

Electrical Contractors Insurance
Electrical installation, service and commissioning call for a clear account of voltage, energization and testing practices.

Plumbing Contractors Insurance
A small connection failure can cause extensive water damage, especially in occupied or multistory buildings.

HVAC & Mechanical Contractors Insurance
Mechanical systems combine installation risk with controls, indoor air quality and performance expectations.

Excavation & Grading Contractors Insurance
Below-grade work requires attention to what is beneath the site as well as the equipment above it.

Roofing Contractors Insurance
Roofing submissions should distinguish installation methods, building use and temporary weather protection.

Crane & Rigging Contractors Insurance
The lift plan, load and contract determine the insurance questions—not simply the crane’s replacement value.

Steel Erection Contractors Insurance
Structural steel work brings erection sequencing, temporary stability and elevated work into the insurance review.

Demolition Contractors Insurance
Selective interior work and full structural demolition present materially different underwriting profiles.

Heavy Civil & Highway Contractors Insurance
Road, earthwork and public infrastructure contracts combine heavy equipment with live traffic and long project schedules.

Underground Utility Contractors Insurance
Water, sewer, gas, power and communications installation each bring a distinct combination of excavation and service-interruption risk.

Power Line & Distribution Contractors Insurance
Energized line work and storm restoration need a submission that describes exactly how crews operate.

Bridge & Infrastructure Contractors Insurance
Bridge work combines structural exposures with traffic, waterway and public-owner requirements.

Millwrights & Industrial Maintenance Insurance
Machinery installation and shutdown work can affect an entire production line.

Welding & Fabrication Contractors Insurance
Shop fabrication, field welding and structural work should be separated in the underwriting narrative.

Fire Sprinkler Contractors Insurance
Life-safety systems create both water-damage exposure and performance obligations that may surface long after installation.

Solar & Renewable Energy Contractors Insurance
Renewable projects combine electrical, roof, installation and commissioning exposures.

Environmental & Remediation Contractors Insurance
A remediation scope should be explicit about contaminants, media, methods and disposal responsibility.

Marine Construction & Dredging Contractors Insurance
Marine projects require careful attention to employee duties, vessels, equipment and work locations.

Painting & Coating Contractors Insurance
Industrial coatings, blasting and occupied-building work should not be grouped under a generic painting description.

Masonry Contractors Insurance
Masonry projects depend on temporary stability, access systems and coordination with other trades.

Carpentry & Framing Contractors Insurance
Structural framing and finish carpentry carry different hazards and completed-work exposures.

Directional Drilling & Boring Contractors Insurance
A bore’s path, ground conditions and utility crossings are central to the insurance submission.
