Before signing a contract
Start with contractual risk transfer, additional insured status and insurance red flags. Separate the obligations you accept from the protection actually provided by a policy.
Before starting work
Review trade-specific exposures, project insurance responsibilities and safety planning with the appropriate advisers. The useful question is whether the actual operation is accurately described and addressed.
Before renewal
Check what changed: revenue, payroll, equipment, geographic reach, contract sizes, subcontracting or design responsibilities. Those changes may matter more than last year’s policy names.

