Define the work before selecting coverage
Horizontal directional drilling, utility bores, trenchless installation and crossing work. Describe drilling fluids, waterway crossings and subcontracted locating.
Exposures to examine
- Utility strike
- Inadvertent drilling-fluid return
- Ground settlement
- Damage to adjacent facilities
Contract and project considerations
Review underground damage and pollution provisions for drilling-fluid releases. Allocation of unknown ground conditions and design responsibility should be resolved in the contract.
Prepare a useful underwriting submission
- Maximum bore diameter and length
- Geotechnical and locating procedures
- Crossing permits and response plans
- Rig values and subcontractor scopes
Geography, workforce and project structure
Identify the states, utility owners and planned crossing types, including road, rail and water crossings. Describe crew and subcontractor responsibilities for locating, drilling and restoration, with payroll, bore and project values, equipment schedules and current policies ready for review before a new assignment.
Sources & further reading
Reference review: October 27, 2026 · Content owner: Montridge Insurance Services, Inc.
Official references support their stated regulatory or educational topics. They do not verify policy terms or a particular contractor’s compliance.

