VETERAN-OWNED · INDEPENDENT INSURANCE BROKERAGECall 702-749-4369
Montridge Insurance Services, Inc.Construction InsuranceFrom the Jobsite to the Contract
Coverage solutions

General Liability

Evaluate third-party injury and property-damage exposures alongside completed work.

Temporary barricades, warning lamps and roadwork signs separating a public sidewalk from street construction

What to evaluate

CGL may respond to covered bodily injury or property damage arising from operations or completed work. Coverage depends on the policy trigger, insured status, allegations and exclusions; it is not a guarantee of workmanship.

Construction defect insurance: coverage gaps and completed operations

Terms and questions that matter

  • Ongoing versus completed operations
  • Damage to your work and property being worked on
  • Residential, height, roofing or designated-work restrictions
  • Per-project aggregates and defense-cost treatment

A practical review scenario

An owner reports water damage after a completed installation. Separate the cost of repairing the defective component from damage to other property, and review the relevant facts and policy language. This is an illustrative scenario, not a reported claim or coverage determination.

Bring the documents into the discussion

Provide the current policy and endorsements, proposed contract insurance requirements, operations narrative and relevant schedules. Compare quoted wording with the actual work before deciding whether a limit, coverage extension or separate policy is appropriate. Resolve outstanding underwriting conditions before work begins.

Sources & further reading

Reference review: October 27, 2026 · Content owner: Montridge Insurance Services, Inc.

Official references support their stated regulatory or educational topics. They do not verify policy terms or a particular contractor’s compliance.

A conversation is a useful first step

Let’s look at the work.
Then the insurance.

Your operations. Your contracts. Your next project.

Schedule a consultation or call 702-749-4369