Define the work before selecting coverage
Dock and pier construction, bulkheads, dredging, pile driving and shoreline stabilization. Identify diving, crewed vessels, barges and navigable-water operations.
Exposures to examine
- Vessel collision
- Damage to underwater property
- Sediment release
- Employee injury over or adjacent to water
Contract and project considerations
State WC, USL&H, Jones Act and maritime employers liability are not interchangeable. Coverage analysis requires statutory tests and actual duties; working near water alone does not resolve applicability.
Prepare a useful underwriting submission
- Vessel and barge schedules
- Employee duties and time afloat
- Dredging and disposal methods
- Contractual maritime indemnities
Geography, workforce and project structure
Describe project states, waterways, vessel use and the work performed from shore, barges or other floating equipment. Identify employee and subcontractor duties, payroll by operation, equipment and contract values, and current policies so workforce jurisdiction and changes in marine operations can be reviewed before mobilization.
Sources & further reading
Reference review: October 27, 2026 · Content owner: Montridge Insurance Services, Inc.
Official references support their stated regulatory or educational topics. They do not verify policy terms or a particular contractor’s compliance.

