VETERAN-OWNED · INDEPENDENT INSURANCE BROKERAGECall 702-749-4369
Montridge Insurance Services, Inc.Construction InsuranceFrom the Jobsite to the Contract
Coverage solutions

USL&H & Maritime Workers Compensation

Employee duties and work locations determine which maritime questions need specialist review.

Shipyard contractors fastening a metal platform aboard a ship during overhaul

What to evaluate

State WC, USL&H, Jones Act and maritime employers liability are different frameworks. Longshore coverage involves statutory status and situs considerations and exclusions. Vessel crew status requires separate analysis. Proximity to water alone is insufficient.

Terms and questions that matter

  • Duties and work locations by employee group
  • Time aboard vessels and vessel connection
  • Dock, pier, dredging and bridge work
  • Coordination with state WC and maritime forms

A practical review scenario

A crew divides time between land-based fabrication and pier work. Analyze actual duties and locations with qualified advisers before deciding which coverage structure applies. This is an illustrative scenario, not a reported claim or coverage determination.

Bring the documents into the discussion

Provide the current policy and endorsements, proposed contract insurance requirements, operations narrative and relevant schedules. Compare quoted wording with the actual work before deciding whether a limit, coverage extension or separate policy is appropriate. Resolve outstanding underwriting conditions before work begins.

Sources & further reading

Reference review: October 27, 2026 · Content owner: Montridge Insurance Services, Inc.

Official references support their stated regulatory or educational topics. They do not verify policy terms or a particular contractor’s compliance.

A conversation is a useful first step

Let’s look at the work.
Then the insurance.

Your operations. Your contracts. Your next project.

Schedule a consultation or call 702-749-4369