VETERAN-OWNED · INDEPENDENT INSURANCE BROKERAGECall 702-749-4369
Montridge Insurance Services, Inc.Construction InsuranceFrom the Jobsite to the Contract
Contractor specialties

Crane & Rigging Contractors Insurance

The lift plan, load and contract determine the insurance questions—not simply the crane’s replacement value.

Mobile crane boom and hook block at an urban construction project.

Define the work before selecting coverage

Operated crane service, machinery moving, rigging, erection and bare rental. Identify critical lifts, tandem lifts, equipment assembly and engineered lift planning.

Exposures to examine

  • Dropped loads
  • Overturn and ground failure
  • Contact with power lines
  • Damage to property being lifted

Contract and project considerations

Ask how property in your care, custody or control and riggers liability are addressed. Physical damage to the crane does not establish coverage for the load, business interruption or engineered lift advice.

Prepare a useful underwriting submission

  • Crane capacities and equipment values
  • Maximum load values
  • Operator and rigger qualifications
  • Lift plans, rental contracts and loss history

Geography, workforce and project structure

Identify the jurisdictions where cranes travel and lifts occur, including whether contracts involve operated equipment, bare rental or specialized rigging. Bring crew payroll by state, lift and load details, subcontractor roles, equipment values and existing policies so each change in territory or lifting scope can be reviewed.

Sources & further reading

Reference review: October 27, 2026 · Content owner: Montridge Insurance Services, Inc.

Official references support their stated regulatory or educational topics. They do not verify policy terms or a particular contractor’s compliance.

A conversation is a useful first step

Let’s look at the work.
Then the insurance.

Your operations. Your contracts. Your next project.

Schedule a consultation or call 702-749-4369