Define the work before selecting coverage
Machinery setting, alignment, conveyor installation, maintenance and plant turnarounds. Separate fabrication, engineering and testing obligations.
Exposures to examine
- Damage to customer equipment
- Unexpected energization
- Hot-work fire
- Delay in restarting production
Contract and project considerations
Customer equipment in your custody and financial loss from a missed restart deserve specific review. A promise to meet a production target may exceed an insurable professional or liability exposure.
Prepare a useful underwriting submission
- Machinery values and lift responsibilities
- Lockout coordination with the plant
- Testing and commissioning scope
- Shutdown schedules and subcontractors
Geography, workforce and project structure
List the states and industrial facilities served, including shutdown schedules and responsibilities for machinery installation, alignment or maintenance. Document traveling crews, payroll by operation and state, subcontractor roles, equipment values and current insurance before reviewing new facilities or an expanded scope of work.