Define the work before selecting coverage
Bridge rehabilitation, concrete repair, deck replacement, foundations and infrastructure construction. Identify work over water, diving and marine equipment.
Exposures to examine
- Structural instability
- Dropped materials onto traffic
- Work over navigable water
- Scour or environmental disturbance
Contract and project considerations
Evaluate maritime employee exposures separately from state workers compensation. Resolve responsibility for temporary structures and existing-property damage before signing.
Prepare a useful underwriting submission
- Work over water and employee duties
- Maximum spans and contract values
- Temporary works engineering
- Crane, barge and subcontractor use
Geography, workforce and project structure
Identify bridge locations and the road, rail or water interfaces involved, along with your role in construction, rehabilitation or maintenance. Separate employee and subcontracted structural work, payroll by state and project values, and provide current policies for review before work begins in a new jurisdiction.
Sources & further reading
Reference review: October 27, 2026 · Content owner: Montridge Insurance Services, Inc.
Official references support their stated regulatory or educational topics. They do not verify policy terms or a particular contractor’s compliance.

