Coverage solutions

Wrap-Up Insurance: OCIP & CCIP

Enrollment is the start of a coverage review, not the end.

Tower crane, concrete forms and scaffolding at a large building construction site

What to evaluate

Owner- or contractor-controlled programs may cover specified participants and operations under selected lines. Review enrollment, exclusions, deductibles, off-site work, completed operations and the interaction with each contractor’s own policies.

Construction defect insurance: coverage gaps and completed operations

Terms and questions that matter

  • Enrollment and excluded contractors
  • Covered locations and operations
  • Payroll reporting and insurance credits
  • Completed-operations term and closeout

A practical review scenario

A subcontractor fabricates materials in its own shop for an enrolled project. Confirm whether that off-site activity is insured under the wrap-up, its own program or neither. This is an illustrative scenario, not a reported claim or coverage determination.

Bring the documents into the discussion

Provide the current policy and endorsements, proposed contract insurance requirements, operations narrative and relevant schedules. Compare quoted wording with the actual work before deciding whether a limit, coverage extension or separate policy is appropriate. Resolve outstanding underwriting conditions before work begins.

Sources & further reading

Reference review: October 27, 2026 · Content owner: Montridge Insurance Services, Inc.

Official references support their stated regulatory or educational topics. They do not verify policy terms or a particular contractor’s compliance.

A conversation is a useful first step