Define the assignment
Describe the shutdown scope, equipment involved, hot work, confined spaces and restart milestones. Coordinate energy isolation and contractor interfaces with the facility’s qualified personnel.
Project review priorities
- Machinery custody and lifting
- Hazardous materials and residual product
- Testing and restart responsibilities
- Delay, lost-production and performance clauses
Before mobilization
Review insurance before accepting broad liability for production interruption. The plant’s property policy should not be assumed to cover the contractor’s interests or contractual obligations.
Prepare for the discussion
Bring the project scope, proposed agreements, insurance specifications, schedule, site details and current policy documents. Identify bid deadlines and unresolved owner or subcontractor requirements. Secure document exchange can be arranged directly; no documents need to be uploaded to this website.