Owners & Contractors Protective Liability

OCP policies should be compared with—not assumed equivalent to—additional insured coverage.

Two professionals in hard hats and reflective vests reviewing work at a precast-concrete production site

What to evaluate

An OCP policy may insure the named owner or other designated insured for specified liability arising from a designated contractor’s work. The named insured, designated operations and scope are critical. It does not replace the contractor’s own program.

Terms and questions that matter

  • Correct named insured and designated contractor
  • Project location and covered operations
  • Limits, defense and termination
  • Interaction with additional insured requirements

A practical review scenario

An owner requests OCP in addition to CGL additional insured status. Review the separate policy and contract purpose rather than treating either document as interchangeable. This is an illustrative scenario, not a reported claim or coverage determination.

Bring the documents into the discussion

Provide the current policy and endorsements, proposed contract insurance requirements, operations narrative and relevant schedules. Compare quoted wording with the actual work before deciding whether a limit, coverage extension or separate policy is appropriate. Resolve outstanding underwriting conditions before work begins.

Sources & further reading

Reference review: October 27, 2026 · Content owner: Montridge Insurance Services, Inc.

Official references support their stated regulatory or educational topics. They do not verify policy terms or a particular contractor’s compliance.

A conversation is a useful first step

Let’s look at the work.
Then the insurance.

Your operations. Your contracts. Your next project.

Schedule a consultation or call 702-749-4369